Bioremediation of copper in sediments from a constructed wetland ex situ with the novel bacterium Cupriavidus basilensis SRS

Abstract The H-02 constructed wetland was designed to remove metals (primarily copper and zinc) to treat building process water and storm water runoff from multiple sources associated with the Tritium Facility at the DOE-Savannah River Site, Aiken, SC. The concentration of Cu and Zn in the sediments...

Full description

Bibliographic Details
Main Authors: Alex Kugler, Robin L. Brigmon, Abby Friedman, Fanny M. Coutelot, Shawn W. Polson, John C. Seaman, Waltena Simpson
Format: Article
Language:English
Published: Nature Portfolio 2022-10-01
Series:Scientific Reports
Online Access:https://doi.org/10.1038/s41598-022-20930-0