Feasibility study on lengthening the high-voltage cable section and reducing the number of cable joints via alternative bonding methods
Among all failures in cable circuits, the failure rate of cable joints is much higher than that in cable bodies. In an effort to reduce cable failure rates and improve the reliability of power cable systems, this article studies the possibility of increasing the length of a cable section and thus re...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2019-06-01
|
Series: | High Voltage |
Subjects: | |
Online Access: | https://digital-library.theiet.org/content/journals/10.1049/hve.2019.0011 |