Determining critical paths of projects by a new hybrid approach based on developed MULTIMOORA and SWARA methods under consideration of time, cost, quality, risk and safety criteria in an interval type-2 fuzzy environment

Critical path method is one of the most widely used approaches in planning and project control. Time is considered a determinative criterion for the critical path. But it seems necessary to regard other criteria in addition to time. Besides time criterion, effective criteria such as quality, cost, r...

Full description

Bibliographic Details
Main Authors: Yahya Dorfeshan, Seyed Meysam Mousavi, Behnam Vahdani
Format: Article
Language:fas
Published: Allameh Tabataba'i University Press 2022-12-01
Series:Muṭāli̒āt-i Mudīriyyat-i Ṣan̒atī
Subjects:
Online Access:https://jims.atu.ac.ir/article_14396_0acdf51c82a37278a04955b76c7854fe.pdf