Early loading of floor monolithic slabs with removable forms
This article considers the technology of early loading monolithic slabs using beam and rack timbering.The main principle is the next: after the concrete is cured to the required strength, the forms are removed and the support shores are installed for load transfer to the underlying floor slab. Such...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Peter the Great St. Petersburg Polytechnic University
2010-06-01
|
Series: | Инженерно-строительный журнал |
Subjects: | |
Online Access: | http://engstroy.spb.ru/index_2010_04/nikonorov_monolit.pdf |