Design of Automatic Switchover System of Mine Ventilators without Blowing-out Based on S7-300 PLC

In view of problem that high gas outburst mines would appear over-limit phenomenon of gas concentration in short stop time of ventilator when main ventilator makes switchover, the paper proposed a design scheme of automatic switchover system of mine ventilator without blowing-out based on S7-300 PLC...

Full description

Bibliographic Details
Main Authors: JIAO Xiao-yu, MA Xiao-ping, ZOU Xiao-fu
Format: Article
Language:zho
Published: Editorial Department of Industry and Mine Automation 2011-10-01
Series:Gong-kuang zidonghua
Subjects:
Online Access:http://www.gkzdh.cn/article/id/5906