Assessment of Riverbed Clogging in Reservoirs by Analysis of Periodic Oscillation of Reservoir Level and Groundwater Level
In the area of the the Krško alluvial field, the Brežice hydroelectric power plant (BHPP), with its surface water reservoir, was completed in 2017. The new BHPP reservoir dam is located approximately 7 km air distance downstream of the old Krško nuclear power plant (NEK) reservoir dam. The NEK dam w...