Assessment of Riverbed Clogging in Reservoirs by Analysis of Periodic Oscillation of Reservoir Level and Groundwater Level

In the area of the the Krško alluvial field, the Brežice hydroelectric power plant (BHPP), with its surface water reservoir, was completed in 2017. The new BHPP reservoir dam is located approximately 7 km air distance downstream of the old Krško nuclear power plant (NEK) reservoir dam. The NEK dam w...

Full description

Bibliographic Details
Main Authors: Eva Koren, Miran Veselič, Goran Vižintin
Format: Article
Language:English
Published: MDPI AG 2021-09-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/14/19/6226