Study on Unscheduled Direct Maintenance Cost of Civil Aircraft Structure
To solve the problem of the unscheduled direct maintenance cost of civil aircraft structure is difficult to predict in the design phase. The elements and influence factors of DMC are introduced, and the prediction flow, model and adjustment model are established. Based on engineering design inputs a...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Department of Advances in Aeronautical Science and Engineering
2019-06-01
|
Series: | Hangkong gongcheng jinzhan |
Subjects: | |
Online Access: | http://hkgcjz.cnjournals.com/hkgcjz/article/abstract/2018088?st=article_issue |