Optimal placement of STATCOM using a reduced computational burden by minimum number of monitoring units based on area of vulnerability
Abstract Various Flexible Alternating Current Transmission System (FACTS) devices are used to improve the power quality and reliability of power system. In addition to the technical constraints, the installation and maintenance costs limit the exploitation of such devices. To maximize the efficiency...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2023-05-01
|
Series: | IET Generation, Transmission & Distribution |
Subjects: | |
Online Access: | https://doi.org/10.1049/gtd2.12804 |