A Method of Flow-Shop Re-Scheduling Dealing with Variation of Productive Capacity
We can make optimum scheduling results using various methods that are proposed by many researchers. However, it is very difficult to process the works on time without delaying the schedule. There are two major causes that disturb the planned optimum schedules; they are (1)the variation of productive...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
International Institute of Informatics and Cybernetics
2005-02-01
|
Series: | Journal of Systemics, Cybernetics and Informatics |
Subjects: | |
Online Access: | http://www.iiisci.org/Journal/CV$/sci/pdfs/P686773.pdf
|