Research on fine design method of pre-drainage zoning borehole on high gas working face

At present, single borehole spacing is generally used to pre-drainage gas on high gas working face. But in the design of pre-drainage boreholes, influence of geological structure and other factors on the design of pre-drainage area are not considered, and relationship between extraction time and bor...

Full description

Bibliographic Details
Main Author: YANG Liping
Format: Article
Language:zho
Published: Editorial Department of Industry and Mine Automation 2019-07-01
Series:Gong-kuang zidonghua
Subjects:
Online Access:http://www.gkzdh.cn/article/doi/10.13272/j.issn.1671-251x.2019010102