Study on the Division of the Affected Zone under Construction Unloading and Its Construction Sequence of the Multiline Parallel River-Crossing Pipe Jacking

There are many advantages of reasonably determining the affected zone and its construction sequence for the multiline parallel pipe-jacking construction, such as convenient to reasonably arrange the pipeline section distribution mode, reducing the construction safety risk, and construction difficult...

Full description

Bibliographic Details
Main Authors: Zhang Ziguang, Mao Ruijin, Zhang Jiesheng, Wang Xuefeng, Zhang Mengqing
Format: Article
Language:English
Published: Hindawi Limited 2023-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2023/6667430