STUDI KELAYAKAN PEMBANGKIT LISTRIK TENAGA HIBRIDA DI PULAU PANJANG
Abstract<br />Electrical energy conditions in Pulau Panjang have been supplied by PLTD with 12 hours operation time, so by utilizing renewable energy can increase electricity production for 24 hours. This study aims to design an optimal PLTH system to save fuel consumption and reduce emissions...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Sultan Ageng Tirtayasa
2017-02-01
|
Series: | Gravity: Jurnal Ilmiah Penelitian dan Pembelajaran Fisika |
Subjects: | |
Online Access: | http://jurnal.untirta.ac.id/index.php/Gravity/article/view/2407 |