STUDI KELAYAKAN PEMBANGKIT LISTRIK TENAGA HIBRIDA DI PULAU PANJANG
Abstract<br />Electrical energy conditions in Pulau Panjang have been supplied by PLTD with 12 hours operation time, so by utilizing renewable energy can increase electricity production for 24 hours. This study aims to design an optimal PLTH system to save fuel consumption and reduce emissions...
Main Authors: | Andri Suherman, Widia Tri Priane, Ajra Salmah, Rosdiansyah Rosdiansyah |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Sultan Ageng Tirtayasa
2017-02-01
|
Series: | Gravity: Jurnal Ilmiah Penelitian dan Pembelajaran Fisika |
Subjects: | |
Online Access: | http://jurnal.untirta.ac.id/index.php/Gravity/article/view/2407 |
Similar Items
-
Optimasi Sistem Pembangkit Listrik Tenaga Hybrid di Pulau Enggano
by: Dyah Ayu Kartika Sari, et al.
Published: (2022-05-01) -
Analisis Mode Sistem Pembangkit Listrik Tenaga Hibrid Microhydro - Photovoltaic Array Menggunakan Homer (Studi Kasus : Kampung Bayang Janiah, Kabupaten Pesisir Selatan)
by: Novi Kurniasih, et al.
Published: (2015-03-01) -
ANALISIS EMISI CO2 PLTP ULUBELU LAMPUNG DAN KOTRIBUSINYA TERHADAP PENGEMBANGAN PEMBANGKIT LISTRIK DI PROVINSI LAMPUNG
by: Alimuddin Muchtar
Published: (2019-07-01) -
Technoeconomic Analysis of a Hybrid Energy System for an Academic Building
by: Suchismita Roy, et al.
Published: (2023-02-01) -
Optimal Sizing and Assessment of an Islanded Photovoltaic‐Battery‐Diesel Generator Microgrid Applicable to a Remote School of Bangladesh
by: Md. Fatin Ishraque, et al.
Published: (2021-01-01)