Study for Operation Method of Underwater Cable and Pipeline Burying ROV Trencher using Barge and Its Application in Real Construction
We developed a heavy-duty work class ROV trencher named URI-T (Underwater robot it’s trencher) that can conduct burial and maintenance tasks for underwater cables and small diameter pipelines. It requires various supporting systems, including a dynamic positioning (DP) vessel, launch and recovery sy...
Main Authors: | , , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
The Korean Society of Ocean Engineers
2020-10-01
|
Series: | 한국해양공학회지 |
Subjects: | |
Online Access: | https://www.joet.org/journal/view.php?number=2986 |
_version_ | 1811296070525779968 |
---|---|
author | Min-Gyu Kim Hyungjoo Kang Mun-Jik Lee Gun Rae Cho Ji-Hong Li Tae-Sam Yoon Jaeheung Ju Han-Wan Kwak |
author_facet | Min-Gyu Kim Hyungjoo Kang Mun-Jik Lee Gun Rae Cho Ji-Hong Li Tae-Sam Yoon Jaeheung Ju Han-Wan Kwak |
author_sort | Min-Gyu Kim |
collection | DOAJ |
description | We developed a heavy-duty work class ROV trencher named URI-T (Underwater robot it’s trencher) that can conduct burial and maintenance tasks for underwater cables and small diameter pipelines. It requires various supporting systems, including a dynamic positioning (DP) vessel, launch and recovery system (LARS), A-frame, and winch in order to perform burial tasks because of its dimensions (6.5 m × 5.0 m × 4.5 m, 20 t) and the tough working environment. However, operating a DP vessel has disadvantages as it is expensive to rent and operate and it is difficult to adjust the working schedule for some domestic coast construction cases. In this paper, we propose a method using a barge instead of a DP vessel to avoid the above disadvantages. Although burying the cable and pipeline using a barge has lower working efficiency than a DP vessel, it can save construction expenses and does not require a large crew. The proposed method was applied over two months at the construction of the water supply in Yokji-do, and the results were verified. |
first_indexed | 2024-04-13T05:42:52Z |
format | Article |
id | doaj.art-4b977e0afd3e4daaae18c34bd41dd3f4 |
institution | Directory Open Access Journal |
issn | 1225-0767 2287-6715 |
language | English |
last_indexed | 2024-04-13T05:42:52Z |
publishDate | 2020-10-01 |
publisher | The Korean Society of Ocean Engineers |
record_format | Article |
series | 한국해양공학회지 |
spelling | doaj.art-4b977e0afd3e4daaae18c34bd41dd3f42022-12-22T03:00:02ZengThe Korean Society of Ocean Engineers한국해양공학회지1225-07672287-67152020-10-0134536137010.26748/KSOE.2020.034Study for Operation Method of Underwater Cable and Pipeline Burying ROV Trencher using Barge and Its Application in Real ConstructionMin-Gyu Kim0https://orcid.org/0000-0001-8517-6352Hyungjoo Kang1https://orcid.org/0000-0001-8838-3285Mun-Jik Lee2https://orcid.org/0000-0001-7806-3237Gun Rae Cho3https://orcid.org/0000-0002-8536-4844Ji-Hong Li4https://orcid.org/0000-0002-5162-2737Tae-Sam Yoon5https://orcid.org/0000-0002-7274-8355Jaeheung Ju6https://orcid.org/0000-0002-9549-7982Han-Wan Kwakhttps://orcid.org/0000-0002-1705-8124Korea Institute of Robot and Convergence (KIRO)Korea Institute of Robot and Convergence (KIRO)Korea Institute of Robot and Convergence (KIRO)Korea Institute of Robot and Convergence (KIRO)Korea Institute of Robot and Convergence (KIRO)Korea Offshore Company (KOC)Korea Offshore Company (KOC)We developed a heavy-duty work class ROV trencher named URI-T (Underwater robot it’s trencher) that can conduct burial and maintenance tasks for underwater cables and small diameter pipelines. It requires various supporting systems, including a dynamic positioning (DP) vessel, launch and recovery system (LARS), A-frame, and winch in order to perform burial tasks because of its dimensions (6.5 m × 5.0 m × 4.5 m, 20 t) and the tough working environment. However, operating a DP vessel has disadvantages as it is expensive to rent and operate and it is difficult to adjust the working schedule for some domestic coast construction cases. In this paper, we propose a method using a barge instead of a DP vessel to avoid the above disadvantages. Although burying the cable and pipeline using a barge has lower working efficiency than a DP vessel, it can save construction expenses and does not require a large crew. The proposed method was applied over two months at the construction of the water supply in Yokji-do, and the results were verified.https://www.joet.org/journal/view.php?number=2986rov (remotely operated vehicle)sea floor cable buryingplib (post lay inspection and burial)operation usingconstruction works of water supply in yokji-do |
spellingShingle | Min-Gyu Kim Hyungjoo Kang Mun-Jik Lee Gun Rae Cho Ji-Hong Li Tae-Sam Yoon Jaeheung Ju Han-Wan Kwak Study for Operation Method of Underwater Cable and Pipeline Burying ROV Trencher using Barge and Its Application in Real Construction 한국해양공학회지 rov (remotely operated vehicle) sea floor cable burying plib (post lay inspection and burial) operation using construction works of water supply in yokji-do |
title | Study for Operation Method of Underwater Cable and Pipeline Burying ROV Trencher using Barge and Its Application in Real Construction |
title_full | Study for Operation Method of Underwater Cable and Pipeline Burying ROV Trencher using Barge and Its Application in Real Construction |
title_fullStr | Study for Operation Method of Underwater Cable and Pipeline Burying ROV Trencher using Barge and Its Application in Real Construction |
title_full_unstemmed | Study for Operation Method of Underwater Cable and Pipeline Burying ROV Trencher using Barge and Its Application in Real Construction |
title_short | Study for Operation Method of Underwater Cable and Pipeline Burying ROV Trencher using Barge and Its Application in Real Construction |
title_sort | study for operation method of underwater cable and pipeline burying rov trencher using barge and its application in real construction |
topic | rov (remotely operated vehicle) sea floor cable burying plib (post lay inspection and burial) operation using construction works of water supply in yokji-do |
url | https://www.joet.org/journal/view.php?number=2986 |
work_keys_str_mv | AT mingyukim studyforoperationmethodofunderwatercableandpipelineburyingrovtrencherusingbargeanditsapplicationinrealconstruction AT hyungjookang studyforoperationmethodofunderwatercableandpipelineburyingrovtrencherusingbargeanditsapplicationinrealconstruction AT munjiklee studyforoperationmethodofunderwatercableandpipelineburyingrovtrencherusingbargeanditsapplicationinrealconstruction AT gunraecho studyforoperationmethodofunderwatercableandpipelineburyingrovtrencherusingbargeanditsapplicationinrealconstruction AT jihongli studyforoperationmethodofunderwatercableandpipelineburyingrovtrencherusingbargeanditsapplicationinrealconstruction AT taesamyoon studyforoperationmethodofunderwatercableandpipelineburyingrovtrencherusingbargeanditsapplicationinrealconstruction AT jaeheungju studyforoperationmethodofunderwatercableandpipelineburyingrovtrencherusingbargeanditsapplicationinrealconstruction AT hanwankwak studyforoperationmethodofunderwatercableandpipelineburyingrovtrencherusingbargeanditsapplicationinrealconstruction |