Study for Operation Method of Underwater Cable and Pipeline Burying ROV Trencher using Barge and Its Application in Real Construction

We developed a heavy-duty work class ROV trencher named URI-T (Underwater robot it’s trencher) that can conduct burial and maintenance tasks for underwater cables and small diameter pipelines. It requires various supporting systems, including a dynamic positioning (DP) vessel, launch and recovery sy...

Full description

Bibliographic Details
Main Authors: Min-Gyu Kim, Hyungjoo Kang, Mun-Jik Lee, Gun Rae Cho, Ji-Hong Li, Tae-Sam Yoon, Jaeheung Ju, Han-Wan Kwak
Format: Article
Language:English
Published: The Korean Society of Ocean Engineers 2020-10-01
Series:한국해양공학회지
Subjects:
Online Access:https://www.joet.org/journal/view.php?number=2986
_version_ 1811296070525779968
author Min-Gyu Kim
Hyungjoo Kang
Mun-Jik Lee
Gun Rae Cho
Ji-Hong Li
Tae-Sam Yoon
Jaeheung Ju
Han-Wan Kwak
author_facet Min-Gyu Kim
Hyungjoo Kang
Mun-Jik Lee
Gun Rae Cho
Ji-Hong Li
Tae-Sam Yoon
Jaeheung Ju
Han-Wan Kwak
author_sort Min-Gyu Kim
collection DOAJ
description We developed a heavy-duty work class ROV trencher named URI-T (Underwater robot it’s trencher) that can conduct burial and maintenance tasks for underwater cables and small diameter pipelines. It requires various supporting systems, including a dynamic positioning (DP) vessel, launch and recovery system (LARS), A-frame, and winch in order to perform burial tasks because of its dimensions (6.5 m × 5.0 m × 4.5 m, 20 t) and the tough working environment. However, operating a DP vessel has disadvantages as it is expensive to rent and operate and it is difficult to adjust the working schedule for some domestic coast construction cases. In this paper, we propose a method using a barge instead of a DP vessel to avoid the above disadvantages. Although burying the cable and pipeline using a barge has lower working efficiency than a DP vessel, it can save construction expenses and does not require a large crew. The proposed method was applied over two months at the construction of the water supply in Yokji-do, and the results were verified.
first_indexed 2024-04-13T05:42:52Z
format Article
id doaj.art-4b977e0afd3e4daaae18c34bd41dd3f4
institution Directory Open Access Journal
issn 1225-0767
2287-6715
language English
last_indexed 2024-04-13T05:42:52Z
publishDate 2020-10-01
publisher The Korean Society of Ocean Engineers
record_format Article
series 한국해양공학회지
spelling doaj.art-4b977e0afd3e4daaae18c34bd41dd3f42022-12-22T03:00:02ZengThe Korean Society of Ocean Engineers한국해양공학회지1225-07672287-67152020-10-0134536137010.26748/KSOE.2020.034Study for Operation Method of Underwater Cable and Pipeline Burying ROV Trencher using Barge and Its Application in Real ConstructionMin-Gyu Kim0https://orcid.org/0000-0001-8517-6352Hyungjoo Kang1https://orcid.org/0000-0001-8838-3285Mun-Jik Lee2https://orcid.org/0000-0001-7806-3237Gun Rae Cho3https://orcid.org/0000-0002-8536-4844Ji-Hong Li4https://orcid.org/0000-0002-5162-2737Tae-Sam Yoon5https://orcid.org/0000-0002-7274-8355Jaeheung Ju6https://orcid.org/0000-0002-9549-7982Han-Wan Kwakhttps://orcid.org/0000-0002-1705-8124Korea Institute of Robot and Convergence (KIRO)Korea Institute of Robot and Convergence (KIRO)Korea Institute of Robot and Convergence (KIRO)Korea Institute of Robot and Convergence (KIRO)Korea Institute of Robot and Convergence (KIRO)Korea Offshore Company (KOC)Korea Offshore Company (KOC)We developed a heavy-duty work class ROV trencher named URI-T (Underwater robot it’s trencher) that can conduct burial and maintenance tasks for underwater cables and small diameter pipelines. It requires various supporting systems, including a dynamic positioning (DP) vessel, launch and recovery system (LARS), A-frame, and winch in order to perform burial tasks because of its dimensions (6.5 m × 5.0 m × 4.5 m, 20 t) and the tough working environment. However, operating a DP vessel has disadvantages as it is expensive to rent and operate and it is difficult to adjust the working schedule for some domestic coast construction cases. In this paper, we propose a method using a barge instead of a DP vessel to avoid the above disadvantages. Although burying the cable and pipeline using a barge has lower working efficiency than a DP vessel, it can save construction expenses and does not require a large crew. The proposed method was applied over two months at the construction of the water supply in Yokji-do, and the results were verified.https://www.joet.org/journal/view.php?number=2986rov (remotely operated vehicle)sea floor cable buryingplib (post lay inspection and burial)operation usingconstruction works of water supply in yokji-do
spellingShingle Min-Gyu Kim
Hyungjoo Kang
Mun-Jik Lee
Gun Rae Cho
Ji-Hong Li
Tae-Sam Yoon
Jaeheung Ju
Han-Wan Kwak
Study for Operation Method of Underwater Cable and Pipeline Burying ROV Trencher using Barge and Its Application in Real Construction
한국해양공학회지
rov (remotely operated vehicle)
sea floor cable burying
plib (post lay inspection and burial)
operation using
construction works of water supply in yokji-do
title Study for Operation Method of Underwater Cable and Pipeline Burying ROV Trencher using Barge and Its Application in Real Construction
title_full Study for Operation Method of Underwater Cable and Pipeline Burying ROV Trencher using Barge and Its Application in Real Construction
title_fullStr Study for Operation Method of Underwater Cable and Pipeline Burying ROV Trencher using Barge and Its Application in Real Construction
title_full_unstemmed Study for Operation Method of Underwater Cable and Pipeline Burying ROV Trencher using Barge and Its Application in Real Construction
title_short Study for Operation Method of Underwater Cable and Pipeline Burying ROV Trencher using Barge and Its Application in Real Construction
title_sort study for operation method of underwater cable and pipeline burying rov trencher using barge and its application in real construction
topic rov (remotely operated vehicle)
sea floor cable burying
plib (post lay inspection and burial)
operation using
construction works of water supply in yokji-do
url https://www.joet.org/journal/view.php?number=2986
work_keys_str_mv AT mingyukim studyforoperationmethodofunderwatercableandpipelineburyingrovtrencherusingbargeanditsapplicationinrealconstruction
AT hyungjookang studyforoperationmethodofunderwatercableandpipelineburyingrovtrencherusingbargeanditsapplicationinrealconstruction
AT munjiklee studyforoperationmethodofunderwatercableandpipelineburyingrovtrencherusingbargeanditsapplicationinrealconstruction
AT gunraecho studyforoperationmethodofunderwatercableandpipelineburyingrovtrencherusingbargeanditsapplicationinrealconstruction
AT jihongli studyforoperationmethodofunderwatercableandpipelineburyingrovtrencherusingbargeanditsapplicationinrealconstruction
AT taesamyoon studyforoperationmethodofunderwatercableandpipelineburyingrovtrencherusingbargeanditsapplicationinrealconstruction
AT jaeheungju studyforoperationmethodofunderwatercableandpipelineburyingrovtrencherusingbargeanditsapplicationinrealconstruction
AT hanwankwak studyforoperationmethodofunderwatercableandpipelineburyingrovtrencherusingbargeanditsapplicationinrealconstruction