FUZZY LOGIC MODELLING TO PREDICT THE LEVEL OF GEOTECHNICAL RISKS IN ROCK TUNNEL BORING MACHINE (TBM) TUNNELLING
This study aims to analyze the level of geotechnical risks and predict the advance rate in rock Tunnel Boring Machine (TBM) tunnelling, using a multi-stage fuzzy logic modelling. Twelve parameters, affecting the geotechnical hazard scenario occurrence, which were clustered into five groups, were use...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Zagreb
2020-01-01
|
Series: | Rudarsko-geološko-naftni Zbornik |
Subjects: | |
Online Access: | https://hrcak.srce.hr/file/344626 |