Load testing of Highway Bridge
New segmental concrete bridge has been built near the city Žilina, aligned on European highway corridor E 50. The bridge is composed of the two separate precast prestressed box girder structure constructed by balanced cantilever method. The total length of both structures is 1042 m. The similar supe...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201819602020 |