Load testing of Highway Bridge

New segmental concrete bridge has been built near the city Žilina, aligned on European highway corridor E 50. The bridge is composed of the two separate precast prestressed box girder structure constructed by balanced cantilever method. The total length of both structures is 1042 m. The similar supe...

Full description

Bibliographic Details
Main Authors: Bujňáková Petra, Jošt Jozef, Farbák Matúš
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201819602020