Evaluation of the Hydropower Generation Potential of a Dam Using Optimization Techniques: Application to Doma Dam, Nassarawa, in North Central Nigeria

Optimization models have been developed to maximize annual energy generation from the Doma dam, subject to the constraint of releases for irrigation, ecological purposes, the water supply, the maximum yield from the reservoir and reservoir storage. The model was solved with LINGO software for variou...

Full description

Bibliographic Details
Main Authors: Salami Adebayo Wahab, Sule Bolaji Fatai, Adunkpe Tope Lacroix, Ayanshola Ayanniyi Mufutau, Bilewu Solomon Olakunle
Format: Article
Language:English
Published: Sciendo 2017-03-01
Series:Slovak Journal of Civil Engineering
Subjects:
Online Access:http://www.degruyter.com/view/j/sjce.2017.25.issue-1/sjce-2017-0001/sjce-2017-0001.xml?format=INT