Reduction of electric power losses by the reactive power compensation unit at the point of AC electric traction network sectioning
Changes of electric traction network with regulated and not-regulated reactive power compensation units (CU) are required due to switching on the reactive power static generators at the AC electric traction network sectioning points the specifying calculations of the reactive power. The method of ca...
Main Authors: | , |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Joint Stock Company «Railway Scientific and Research Institute»
2019-12-01
|
Series: | Вестник Научно-исследовательского института железнодорожного транспорта |
Subjects: | |
Online Access: | https://www.journal-vniizht.ru/jour/article/view/339 |