Reduction of electric power losses by the reactive power compensation unit at the point of AC electric traction network sectioning
Changes of electric traction network with regulated and not-regulated reactive power compensation units (CU) are required due to switching on the reactive power static generators at the AC electric traction network sectioning points the specifying calculations of the reactive power. The method of ca...
Main Authors: | Leonid A. German, Aleksander S. Serebryakov |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Joint Stock Company «Railway Scientific and Research Institute»
2019-12-01
|
Series: | Вестник Научно-исследовательского института железнодорожного транспорта |
Subjects: | |
Online Access: | https://www.journal-vniizht.ru/jour/article/view/339 |
Similar Items
-
Increasing railway capacity with the installation of reactive power compensation
by: L. A. German
Published: (2021-04-01) -
On the Mutual Influence of Voltage Control Modes and the Compensation of Reactive Power in the Electrical Networks of Industrial Enterprises
by: V. P. Schasny, et al.
Published: (2021-06-01) -
Fitler compensating installations in AC traction networks
by: L. A. German, et al.
Published: (2016-02-01) -
DIAGNOSTIC OF THE INSULATION STATE OF THE ASYNCHRONOUS MOTOR AND THE POWER SUPPLY CABLE UNDER CONDITIONS OF LOCAL COMPENSATION
by: V. E. Krivonosov
Published: (2017-11-01) -
ON THE SIMULATION OF MODES ОF ELECTRIC POWER SYSTEMS WITH FACTS
by: E. D. Halilov
Published: (2017-07-01)