Hydrodynamic Simulation of Flood Due to Hypothetical Momentary Mosul Dam Failure

Flood wave simulation due to hypothetical momentary failure of Mosul Dam was carried out by applying the (IBER) hydrodynamic model for the dam storage scenarios (300, 310, 320, 330 and 335) meter above sea level after testing the validity and calibration the model to identify areas that will be inun...

Full description

Bibliographic Details
Main Authors: Thair M. Al-Taiee, Mustafa S. Mustafa
Format: Article
Language:English
Published: Tikrit University 2020-12-01
Series:Tikrit Journal of Engineering Sciences
Subjects:
Online Access:https://tj-es.com/ojs/index.php/tjes/article/view/34