Multi-objective Optimization of Power Supply System for Shipping LNG Off-loading Process Based on Switching Markov Chain and Genetic Algorithm
The control of risks is crucial to process safety and loss prevention, such as for the shipping LNG off-loading process. As the transfer arm is the key factor during LNG off-loading process, and the power supply system is the insurance to ensure the transfer arms working normally, the reliability of...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
AIDIC Servizi S.r.l.
2016-04-01
|
Series: | Chemical Engineering Transactions |
Online Access: | https://www.cetjournal.it/index.php/cet/article/view/3402 |