Experimental Study of High Performance Synchronous Grouting Materials Prepared with Clay
Shield construction discharges a large amount of soil and muck. The utilization of discharged soil of shield always has high energy consumption and a low utilization rate. Meanwhile, synchronous grouting is a key process for shield tunneling. The current studies show that the synchronous grouting ma...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-03-01
|
Series: | Materials |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1944/14/6/1362 |