Analysis of movable guide vane inversion and limited block dropping of hydropower plants
The fracture signal of shear pin occurs in the process of short time load reduction of AGC. During the stop site inspection, it is found that the shear pin was broken, the guide vane limit block fell off, and the movable guide vane was reversed. The analysis shows that the installation and welding m...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2019-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/62/e3sconf_icbte2019_02009.pdf |