Tunnel design and construction process in difficult ground conditions with Analysis of Controlled Deformations (ADECO) approach; a Case Study
The 10.6 km long Sabzkuh water conveyance tunnel is currently under construction in High Zagros structural zone, located in western Iran, has used conventional (in section T1) and mechanized (in section T2) methods. The section T1 of the tunnel driven through alluvial geological units with great com...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Tehran
2018-12-01
|
Series: | International Journal of Mining and Geo-Engineering |
Subjects: | |
Online Access: | https://ijmge.ut.ac.ir/article_68704_f90fb8f37b24b634bc8d4d50035a1f8f.pdf |