Tunnel design and construction process in difficult ground conditions with Analysis of Controlled Deformations (ADECO) approach; a Case Study

The 10.6 km long Sabzkuh water conveyance tunnel is currently under construction in High Zagros structural zone, located in western Iran, has used conventional (in section T1) and mechanized (in section T2) methods. The section T1 of the tunnel driven through alluvial geological units with great com...

Full description

Bibliographic Details
Main Authors: Majid Taromi, Abbas Eftekhari
Format: Article
Language:English
Published: University of Tehran 2018-12-01
Series:International Journal of Mining and Geo-Engineering
Subjects:
Online Access:https://ijmge.ut.ac.ir/article_68704_f90fb8f37b24b634bc8d4d50035a1f8f.pdf