Surveying Dewatered Areas in the Fish Spawning Sites during Short-Term Drawdown Operations: Case Study of a Large Hydropower Plant Reservoir in the Lowland Area, Lithuania

This paper presents research on the dewatering areas during drawdown operations in the Kaunas Hydropower Plant (HPP) reservoir situated in the lowland area of Lithuania. It is a multipurpose reservoir primarily used for power generation by two large hydropower plants. Because of the HPP peaking oper...

Full description

Bibliographic Details
Main Authors: Linas Jurevičius, Petras Punys, Egidijus Kasiulis, Linas Šilinis
Format: Article
Language:English
Published: MDPI AG 2022-11-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/15/22/8574