Bi-objective optimization of identical parallel machine scheduling with flexible maintenance and job release times

This paper investigates an identical parallel machine scheduling problem with flexible maintenance and job release times and attempts to optimize two objectives: the minimization of the makespan and total tardiness simultaneously. A mixed-integer programming (MIP) model for solving small-sc...

Full description

Bibliographic Details
Main Authors: Yarong Chen, Zailin Guan, Chen Wang, Fuh-Der Chou, Lei Yue
Format: Article
Language:English
Published: Growing Science 2022-01-01
Series:International Journal of Industrial Engineering Computations
Online Access:http://www.growingscience.com/ijiec/Vol13/IJIEC_2022_23.pdf