Bi-objective optimization of identical parallel machine scheduling with flexible maintenance and job release times
This paper investigates an identical parallel machine scheduling problem with flexible maintenance and job release times and attempts to optimize two objectives: the minimization of the makespan and total tardiness simultaneously. A mixed-integer programming (MIP) model for solving small-sc...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Growing Science
2022-01-01
|
Series: | International Journal of Industrial Engineering Computations |
Online Access: | http://www.growingscience.com/ijiec/Vol13/IJIEC_2022_23.pdf |