Calculation of additional load and deformation of the receiving well enclosure structure caused by shield tunneling.

The bulkhead additional thrust during shield tunneling, the force of friction between shield and soil, and the additional grouting pressure can cause additional stress in the surrounding soil, thereby disturbing existing buildings and structures. However, few studies focused on the disturbance situa...

Full description

Bibliographic Details
Main Authors: Li Xin, Li-Guang Chen, Tong Li, Yi-Lin Yu, Bo Wu
Format: Article
Language:English
Published: Public Library of Science (PLoS) 2024-01-01
Series:PLoS ONE
Online Access:https://journals.plos.org/plosone/article/file?id=10.1371/journal.pone.0297912&type=printable