Calculation of additional load and deformation of the receiving well enclosure structure caused by shield tunneling.
The bulkhead additional thrust during shield tunneling, the force of friction between shield and soil, and the additional grouting pressure can cause additional stress in the surrounding soil, thereby disturbing existing buildings and structures. However, few studies focused on the disturbance situa...
Main Authors: | Li Xin, Li-Guang Chen, Tong Li, Yi-Lin Yu, Bo Wu |
---|---|
Format: | Article |
Language: | English |
Published: |
Public Library of Science (PLoS)
2024-01-01
|
Series: | PLoS ONE |
Online Access: | https://journals.plos.org/plosone/article/file?id=10.1371/journal.pone.0297912&type=printable |
Similar Items
-
Longitudinal Deformation of Deep Shield Tunnels Caused by Upper Load Reduction
by: Jinlei Zheng, et al.
Published: (2021-06-01) -
Analysis of Forces and Deformation Rule of Existing ShieldTunnel Caused by Ground - heaped Load
by: Gang Wei, et al.
Published: (2017-06-01) -
Shielding enclosure /
by: 391003 Lindgren, Erik A. -
Calculation of surface settlement and pile foundation deformation caused by shield machine tunnelling along curve section
by: Feng Zeng, et al.
Published: (2022-10-01) -
Deformation and Mechanical Characteristics of Existing Foundation Pit and Tunnel Itself Caused by Shield Tunnel Undercrossing
by: Ping Lou, et al.
Published: (2022-01-01)