Simulations for the cesium dynamics of the RF-driven prototype ion source for CRAFT N-NBI

To realize an initial objective of the negative ion-based neutral beam injection (N-NBI) at the Comprehensive Research Facility for Fusion Technology (CRAFT) test facility, which targets an H0 beam power of 2 MW at an energy of 200–400 keV and a pulse duration of 100 s, it is crucial to study the ce...

Full description

Bibliographic Details
Main Authors: Yalong Yang, Yong Wu, Lizhen Liang, Jianglong Wei, Rui Zhang, Yahong Xie, Wei Liu, Chundong Hu
Format: Article
Language:English
Published: Elsevier 2024-04-01
Series:Nuclear Engineering and Technology
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S1738573323005181