Case-Study: Fully Prefabricated Wood Wall Connection to Improve Building Envelope and On-Site Efficiency
As fully prefabricated wood walls (FPWW) are envisioned to increase building envelope performance, the junction between panels becomes crucial. Since FPWW restricts access to the inter-panel joints, it is preferable to generate an upstream mechanism to complete the joint automatically on-site. This...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-12-01
|
Series: | Buildings |
Subjects: | |
Online Access: | https://www.mdpi.com/2075-5309/12/12/2185 |