Research on Safety Monitoring Management System of Earth-Rock Dams Based on BIM+GIS and Its Application
Considering the problems such as difficult assets management and data barriers during the operation stage of hydropower engineering,the BIM+GIS technology is introduced to effectively integrate structured and unstructured data in every stage and facilitate the digitization of engineering and capital...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2022-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.02.004 |