Optimal Solution to the Two-Stage Hybrid Flow Shop Scheduling Problem with Removal and Transportation Times
The two-stage hybrid flow shop scheduling problem with removal and transportation times is addressed in this paper. The maximum completion time is the objective function to be minimized. This scheduling problem is modeling real-life situations encountered in manufacturing and industrial areas. On th...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-07-01
|
Series: | Symmetry |
Subjects: | |
Online Access: | https://www.mdpi.com/2073-8994/14/7/1424 |