Stability Analysis of Blasting Excavation for High Rock Slope of Highway Reconstruction and Expansion
To analyze the stability of high rock slopes under millisecond blasting in the paper, time-history curves of millisecond blasting dynamic loads are established based on field data from the reconstruction and extension project of the Beijing-Shanghai Highway. Numerical simulations and field monitorin...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2022-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2022/5447614 |