Research on Construction Sequences and Construction Methods of the Small Clear-Distance, Double-Arch Tunnel under an Asymmetrical Load
A small clear-distance, double-arch tunnel under an asymmetrical load combines the characteristics of small clear-distance, tunnels and double-arch tunnels, and the influence of an asymmetrical terrain must be considered. Its construction stability is a problem worth studying. This paper used the We...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2023-07-01
|
Series: | Applied Sciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3417/13/14/8242 |