Observed response of maglev structure undercrossed by three shield tunnels in soft soil

This paper investigates the response of a maglev structure to three under-crossing tunnels of the Shanghai Metro Line 13. The minimal distance between the tunnels and pile groups of the maglev structure is only 1.5 m, thus the deformations of the maglev structure are strictly controlled for the serv...

Full description

Bibliographic Details
Main Authors: Dong-Mei Zhang, Xiao-Chuang Xie, Zhong-Kai Huang, Mao-Zhu Peng, Hong-Xin Zhu
Format: Article
Language:English
Published: KeAi Communications Co., Ltd. 2022-08-01
Series:Underground Space
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S2467967422000046