The innovative operation of Imha Reservoir
Imha Reservoir has both a water transfer tunnel connecting Andong Reservoir and a selective withdrawal facility (SWF), which enable the innovative operation of the reservoir. Although these facilities had not been equipped when constructed in 1993, these structural measures were applied afterward as...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2022-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2022/13/e3sconf_cigb2022_01029.pdf |