Challenges and problems faced to Quality Control in Cast-In-Place Bored Piling by Rotary Bored Machine at Lalitpur, NEPAL
In a construction project of G+19 Hotel & Residence, there have been parking problem due to lack of sufficient land. So to minimize these problem double basement have been designed for parking floor. The basement excavation is not easy to excavate without proper protection work for retaining dee...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2023-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/67/e3sconf_icmpc2023_01245.pdf |