Challenges and problems faced to Quality Control in Cast-In-Place Bored Piling by Rotary Bored Machine at Lalitpur, NEPAL

In a construction project of G+19 Hotel & Residence, there have been parking problem due to lack of sufficient land. So to minimize these problem double basement have been designed for parking floor. The basement excavation is not easy to excavate without proper protection work for retaining dee...

Full description

Bibliographic Details
Main Authors: Sah Dhiraj Kumar, Bishnoi Surender, Singh Prakash, Serawat Arun, Sharma Prashant
Format: Article
Language:English
Published: EDP Sciences 2023-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/67/e3sconf_icmpc2023_01245.pdf