Challenges and problems faced to Quality Control in Cast-In-Place Bored Piling by Rotary Bored Machine at Lalitpur, NEPAL

In a construction project of G+19 Hotel & Residence, there have been parking problem due to lack of sufficient land. So to minimize these problem double basement have been designed for parking floor. The basement excavation is not easy to excavate without proper protection work for retaining dee...

Full description

Bibliographic Details
Main Authors: Sah Dhiraj Kumar, Bishnoi Surender, Singh Prakash, Serawat Arun, Sharma Prashant
Format: Article
Language:English
Published: EDP Sciences 2023-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/67/e3sconf_icmpc2023_01245.pdf
_version_ 1797658711994400768
author Sah Dhiraj Kumar
Bishnoi Surender
Singh Prakash
Serawat Arun
Sharma Prashant
author_facet Sah Dhiraj Kumar
Bishnoi Surender
Singh Prakash
Serawat Arun
Sharma Prashant
author_sort Sah Dhiraj Kumar
collection DOAJ
description In a construction project of G+19 Hotel & Residence, there have been parking problem due to lack of sufficient land. So to minimize these problem double basement have been designed for parking floor. The basement excavation is not easy to excavate without proper protection work for retaining deep excavations. Soil at its natural form, in a construction site is not suitable to completely bear heavy surcharge loads. For such situations, the soil stability needs to be improved to enhance its strengthen capacity and decrease the expected landslide. There are some techniques for retaining deep excavations for basements which are used at site to take surcharge load during excavation. Depending upon the loading conditions and nature of soil at site, a Cast-In-Place Bored Piling by Rotary Bored Machine technique have been adopted. This paper gives the overview and concept of Cast-In-Place Bored Piling by Rotary Bored Machine, discusses their practical applications and problems faced to Quality Control.
first_indexed 2024-03-11T18:03:19Z
format Article
id doaj.art-856967d3fef0470c8e2046f6e4f18262
institution Directory Open Access Journal
issn 2267-1242
language English
last_indexed 2024-03-11T18:03:19Z
publishDate 2023-01-01
publisher EDP Sciences
record_format Article
series E3S Web of Conferences
spelling doaj.art-856967d3fef0470c8e2046f6e4f182622023-10-17T08:47:39ZengEDP SciencesE3S Web of Conferences2267-12422023-01-014300124510.1051/e3sconf/202343001245e3sconf_icmpc2023_01245Challenges and problems faced to Quality Control in Cast-In-Place Bored Piling by Rotary Bored Machine at Lalitpur, NEPALSah Dhiraj Kumar0Bishnoi Surender1Singh Prakash2Serawat Arun3Sharma Prashant4Dr.K..N. Modi University, Department of Civil EngineeringDr.K..N. Modi University, Department of Civil EngineeringDr.K..N. Modi University, Department of Civil EngineeringDr.K..N. Modi University, Department of Civil EngineeringGLA University, Department of Civil EngineeringIn a construction project of G+19 Hotel & Residence, there have been parking problem due to lack of sufficient land. So to minimize these problem double basement have been designed for parking floor. The basement excavation is not easy to excavate without proper protection work for retaining deep excavations. Soil at its natural form, in a construction site is not suitable to completely bear heavy surcharge loads. For such situations, the soil stability needs to be improved to enhance its strengthen capacity and decrease the expected landslide. There are some techniques for retaining deep excavations for basements which are used at site to take surcharge load during excavation. Depending upon the loading conditions and nature of soil at site, a Cast-In-Place Bored Piling by Rotary Bored Machine technique have been adopted. This paper gives the overview and concept of Cast-In-Place Bored Piling by Rotary Bored Machine, discusses their practical applications and problems faced to Quality Control.https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/67/e3sconf_icmpc2023_01245.pdf
spellingShingle Sah Dhiraj Kumar
Bishnoi Surender
Singh Prakash
Serawat Arun
Sharma Prashant
Challenges and problems faced to Quality Control in Cast-In-Place Bored Piling by Rotary Bored Machine at Lalitpur, NEPAL
E3S Web of Conferences
title Challenges and problems faced to Quality Control in Cast-In-Place Bored Piling by Rotary Bored Machine at Lalitpur, NEPAL
title_full Challenges and problems faced to Quality Control in Cast-In-Place Bored Piling by Rotary Bored Machine at Lalitpur, NEPAL
title_fullStr Challenges and problems faced to Quality Control in Cast-In-Place Bored Piling by Rotary Bored Machine at Lalitpur, NEPAL
title_full_unstemmed Challenges and problems faced to Quality Control in Cast-In-Place Bored Piling by Rotary Bored Machine at Lalitpur, NEPAL
title_short Challenges and problems faced to Quality Control in Cast-In-Place Bored Piling by Rotary Bored Machine at Lalitpur, NEPAL
title_sort challenges and problems faced to quality control in cast in place bored piling by rotary bored machine at lalitpur nepal
url https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/67/e3sconf_icmpc2023_01245.pdf
work_keys_str_mv AT sahdhirajkumar challengesandproblemsfacedtoqualitycontrolincastinplaceboredpilingbyrotaryboredmachineatlalitpurnepal
AT bishnoisurender challengesandproblemsfacedtoqualitycontrolincastinplaceboredpilingbyrotaryboredmachineatlalitpurnepal
AT singhprakash challengesandproblemsfacedtoqualitycontrolincastinplaceboredpilingbyrotaryboredmachineatlalitpurnepal
AT serawatarun challengesandproblemsfacedtoqualitycontrolincastinplaceboredpilingbyrotaryboredmachineatlalitpurnepal
AT sharmaprashant challengesandproblemsfacedtoqualitycontrolincastinplaceboredpilingbyrotaryboredmachineatlalitpurnepal