Analysis of the operation characteristics of a selected wind power plant
The purpose of this paper was to analyse the operation of a wind farm and the wind turbine yields with a total capacity of 46.5 MW. The analysis was divided into two stages: (1) the general characteristics of the facility, which included: a) distribution of wind speeds and the method of calculation...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://doi.org/10.1051/e3sconf/20187001016 |