Analytical Method for Groundwater Seepage through and Beneath a Fully Penetrating Cut-off Wall Considering Effects of Wall Permeability and Thickness

A fully penetrating cut-off wall is a vertical seepage barrier that fully penetrates an aquifer and is embedded in an underlying aquitard to a certain depth. Groundwater seepage with this type of wall occurs through three paths: leakage through the body of the wall in the aquifer, leakage through th...

Full description

Bibliographic Details
Main Authors: Jinling Mei, Hong Cao, Guanyong Luo, Hong Pan
Format: Article
Language:English
Published: MDPI AG 2022-12-01
Series:Water
Subjects:
Online Access:https://www.mdpi.com/2073-4441/14/23/3982