Retaining Wall - Parametric Study of the Method of Reinforcement

The highway section on the D3 highway Hričovské Podhradie – Žilina – Strážov was carried out on the left branch of the highway body on the overpass and on the right branch on the embankment body. The stability of the embankment body was ensured by a geosynthetics reinforced retaining wall. The retai...

Full description

Bibliographic Details
Main Authors: Koleňák Matúš, Slávik Ivan
Format: Article
Language:English
Published: Sciendo 2023-06-01
Series:Civil and Environmental Engineering
Subjects:
Online Access:https://doi.org/10.2478/cee-2023-0034