Retaining Wall - Parametric Study of the Method of Reinforcement
The highway section on the D3 highway Hričovské Podhradie – Žilina – Strážov was carried out on the left branch of the highway body on the overpass and on the right branch on the embankment body. The stability of the embankment body was ensured by a geosynthetics reinforced retaining wall. The retai...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Sciendo
2023-06-01
|
Series: | Civil and Environmental Engineering |
Subjects: | |
Online Access: | https://doi.org/10.2478/cee-2023-0034 |