Modelling and simulation of high pressure fogging air intake cooling unit of Omotosho phase II gas turbine power plant
The aim of this study was to analyze the performance of Omotosho Phase II gas turbine power plant for improved performance. To obtain the required output performance of the gas turbine power plant, operation data from years of 2013 to 2016 was collected from Omotosho Phase II gas turbine power plant...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Ayandegan Institute of Higher Education, Iran
2020-03-01
|
Series: | Journal of Applied Research on Industrial Engineering |
Subjects: | |
Online Access: | http://www.journal-aprie.com/article_106397.html |