On-Site Manufacturing Method for Pre-Tension U-Type Pre-Stressed Concrete Girders and Analytical Performance Verification of Anchoring Blocks Used for Applying Tension Force

Development of U-type pre-stressed girders has been attempted to increase the length of I-type girders in South Korea. However, a length of 30 m or less is common because the self-weight, according to the post-tension method, is large. In this study, the pre-tension method was applied without limiti...

Full description

Bibliographic Details
Main Authors: Dong-Woo Seo, Sangki Park, Ki-Tae Park, Hyun-Ock Jang, Yeon-Woo Shin
Format: Article
Language:English
Published: MDPI AG 2022-11-01
Series:Applied Sciences
Subjects:
Online Access:https://www.mdpi.com/2076-3417/12/23/11892