Roof cutting mechanism of dense drilling in gob-side entry retaining and determination method of key parameters

To achieve the safe and stable structural condition of the roof along the goaf under the roof cutting by dense drilling method, the stress distribution and fracture process of the roof strata between normal and dense drilling conditions were studied. Based on rock fracture theory and elastic theory,...

Full description

Bibliographic Details
Main Authors: Shaowei LIU, Xiaopeng LI, Wenqing ZHU, Mengxiong FU, Dingshan ZHANG, Bo PENG
Format: Article
Language:zho
Published: Editorial Department of Coal Science and Technology 2024-02-01
Series:Meitan kexue jishu
Subjects:
Online Access:http://www.mtkxjs.com.cn/article/doi/10.12438/cst.2023-1760