Effects of house load operation on PSA based on operational experiences in Korea
House load operation (HLO) occurs when the generator supplies power to the house load without triggering reactor trips during grid disturbances. In Korea, the HLO capability of optimized power reactor 1000 (OPR1000) plants has prevented several reactor trips.Operational experiences demonstrate the d...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2020-12-01
|
Series: | Nuclear Engineering and Technology |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S1738573319308642 |