Frost heave performance of a foundation at an overhead transmission line in the alpine seasonal frozen regions

The Manzhouli 500 kV electrical transmission line travels more than 218 km through seasonal frozen regions, which result in many freezing soil engineering problems with respect to the transmission tower foundations. Physical model tests of independent reinforced concrete foundations at various tempe...

Full description

Bibliographic Details
Main Authors: Liang Tang, Zhihe Cheng, Shengyi Cong, Xianzhang Ling
Format: Article
Language:English
Published: Elsevier 2023-02-01
Series:Soils and Foundations
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S0038080623000057