A comparative analysis of artificial neural network predictive and multiple linear regression models for ground settlement during tunnel construction
Ground settlement during and after tunnelling using TBM results in varying dynamic and static load action on the geo-stratum. It is an undesirable effect of tunnel construction causing damage to the surface and subsurface infrastructure, safety risk, and increased construction cost and quality issue...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Polish Academy of Sciences
2023-06-01
|
Series: | Archives of Civil Engineering |
Subjects: | |
Online Access: | https://journals.pan.pl/Content/127769/PDF/art33_int.pdf |