Dynamic Prediction of Longitudinal Settlement of Existing Tunnel Using ConvRes-DLinear Model with Integration of Undercrossing Construction Process Information

Undercrossing construction can cause severe structural deformation of the above existing tunnel in operation. The induced longitudinal differential settlement between the segments can pose a huge risk to running subways, hence it is of great importance to monitor and predict the settlement. Within t...

Full description

Bibliographic Details
Main Authors: Cong Nie, Dongming Zhang, Linghan Ouyang, Xu Huang, Bo Zhang, Yue Tong
Format: Article
Language:English
Published: MDPI AG 2023-06-01
Series:Geosciences
Subjects:
Online Access:https://www.mdpi.com/2076-3263/13/7/189