Dynamic Prediction of Longitudinal Settlement of Existing Tunnel Using ConvRes-DLinear Model with Integration of Undercrossing Construction Process Information
Undercrossing construction can cause severe structural deformation of the above existing tunnel in operation. The induced longitudinal differential settlement between the segments can pose a huge risk to running subways, hence it is of great importance to monitor and predict the settlement. Within t...
Main Authors: | Cong Nie, Dongming Zhang, Linghan Ouyang, Xu Huang, Bo Zhang, Yue Tong |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2023-06-01
|
Series: | Geosciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3263/13/7/189 |
Similar Items
-
Multi-Step-Ahead Wind Speed Forecast Method Based on Outlier Correction, Optimized Decomposition, and DLinear Model
by: Jialin Liu, et al.
Published: (2023-06-01) -
Evaluating Time-Series Prediction of Temperature, Relative Humidity, and CO<sub>2</sub> in the Greenhouse with Transformer-Based and RNN-Based Models
by: Ju Yeon Ahn, et al.
Published: (2024-02-01) -
Prediction of Pollutant Concentration Based on Spatial–Temporal Attention, ResNet and ConvLSTM
by: Cai Chen, et al.
Published: (2023-10-01) -
A Depthwise Separable Fully Convolutional ResNet With ConvCRF for Semisupervised Hyperspectral Image Classification
by: Yuxian Wang, et al.
Published: (2021-01-01) -
Relationship between the Intermediate Soil State and Settlement Control Measures during Tunnel Construction Undercrossing the Existing Station
by: Shengzhi Wu, et al.
Published: (2023-07-01)