Firefighting Equipment Arrangement Optimization for an Offshore Platform Considering Travel Distances

The offshore plant, due to its characteristics, is subject to many restrictions on the material and design of the pipes. Because the design of the firefighting piping depends on the pre-set fire protection design, it is possible to reduce the cost of the piping design by optimizing the arrangement o...

Full description

Bibliographic Details
Main Authors: Byeong Cheol Lee, Youngsu Choi, Hyun Chung
Format: Article
Language:English
Published: MDPI AG 2021-05-01
Series:Journal of Marine Science and Engineering
Subjects:
Online Access:https://www.mdpi.com/2077-1312/9/5/503